A realistic MMP migration timeline

Reviewed 2026-11-10 · By the Airbridge team, which operates this site

Answer in brief

An MMP migration has five phases: audit, SDK release, parallel run, cutover and wind-down. As a planning assumption for a small team with a handful of ad channels, allow six to ten weeks from the first audit to switching off the old SDK. Your app release cycle and the notice period in your current contract set the pace more than the technical work does.

The five phases and how long each takes

The durations below are planning assumptions for a small team with one app and a few ad channels. A larger setup takes longer in phases 1 and 4.

PhasePlan forWhat happens
1. AuditAbout 1 weekList every link, event, ad channel connection and export the old MMP runs today.
2. SDK release1 to 2 weeksAdd the new SDK, map events, pass store review and ship the build.
3. Parallel run2 to 4 weeksBoth SDKs report. You compare the two sets of numbers.
4. CutoverAbout 1 weekLinks and ad channel connections move to the new MMP.
5. Wind-down1 to 2 weeksExport history, remove the old SDK, close the account.

What sets the pace

Three things outside the migration itself decide how fast you can go.

  • Your contract dates. Find the end date and the notice period first. Everything else is scheduled backwards from them.
  • App update adoption. The new SDK only reports for people who have installed the new build. Until most active users are on it, the comparison in phase 3 is lopsided.
  • Your longest attribution window. A parallel run should last at least as long as your longest lookback window, plus a full week, so that late conversions show up on both sides.

Week by week

  1. Week 1. Write the inventory. Read the contract. Choose a target cutover date.
  2. Weeks 2 and 3. Integrate the new SDK, send test installs from a test device and release the build.
  3. Weeks 4 to 6. Compare installs and key events daily. Investigate any gap that does not have an explanation.
  4. Week 7 onward. Move one channel at a time: swap its links and reconnect it on the same day, then watch it before the next.
  5. The last two weeks. Export what you need, ship a build without the old SDK and confirm the old account stops billing.

Where the schedule slips

A common cause of delay is an incomplete inventory. A forgotten QR code on packaging, a partner who still uses an old link, or an event that a bidding strategy depends on will surface during the parallel run and push the cutover back. Another is store review or a release freeze, which you can avoid by booking the SDK work into a release that is already planned.

Leave slack before the contract date. If the comparison looks wrong in week 6, you want time to fix it without paying for another term.

What to do next

Start with the two pieces that take the longest to get right: running both SDKs in parallel and moving your tracking links. If the plan above looks like more work than the problem you are solving, read when switching is not worth it before you book engineering time.

Questions and answers

How long does it take to switch MMPs?

As a planning assumption, allow six to ten weeks for a small team. The SDK work is often a few days. Most of the calendar goes to waiting for users to update the app and to comparing numbers during the parallel run.

When should I start an MMP migration?

Count back from the date your current contract ends or renews. Start early enough that the cutover lands at least a few weeks before that date, so a delay does not force a renewal.

Continue reading