Operated by Airbridge (AB180 Inc.), a mobile measurement partner that appears in this comparison. How we compareReviewed 2026-11-10
bestmmpalternative.comAn Airbridge reference
How we compare

Glossary

Parallel run

Reviewed 2026-11-10 · By the Airbridge team, which operates this site

Definition

A parallel run is the stretch of an MMP migration in which the old and the new SDK are both live in the app and both record the same installs and events. Its purpose is to compare the two sets of numbers and explain the gap before any ad traffic depends on the new MMP.

How it works

The term is also used for other system migrations: the old system keeps doing the real work while the new one runs beside it and is checked against it. In an MMP migration the old MMP stays the system of record and the new one only observes. The run starts when a build with both SDKs is released and ends at cutover. The practical steps, and what to compare, are in running two SDKs in parallel.

When it matters

How long to run depends on what rides on the numbers. A very small app with one channel and no purchase events can keep it short. A team whose campaigns bid on revenue or another in-app event should not skip it, because a counting error would feed straight into bidding. The run also has a cost: two vendors are billed for the same period and the app carries extra code. Set an end date at the start.

How it relates to attribution

A parallel run tests counting more than attribution. Ads still use the old links, so the new MMP sees installs without the clicks behind them and shows most as organic. What the run does give you is a ratio between old and new numbers, the only bridge across the break in your historical data.

More terms

  • Glossary

    Discrepancy

    A discrepancy is the gap between what an MMP reports and what an ad platform reports for the same campaign. The usual causes and when to worry.

  • Glossary

    Cutover

    Cutover is the point in an MMP migration when tracking links and ad channel connections move from the old MMP to the new one. What changes and how to plan it.

  • Glossary

    Lock-in

    Lock-in is everything that makes leaving an MMP costly: contract terms, links on a vendor domain, history you cannot export and SDK work. How to reduce it.

  • Alternatives

    Best MMP alternative to AppsFlyer and Adjust

    What to check in an AppsFlyer or Adjust plan, four alternatives with public entry prices, and a short checklist for switching MMPs.

Cite this page

Airbridge. “Parallel run.” bestmmpalternative.com. Reviewed 2026-11-10. https://bestmmpalternative.com/glossary/parallel-run